Electrical Tip: A Complete Guide to CRE's Electrical Services

Our electrical services are listed below, alongside the information you will need to upload if you are requesting the service.


1. NVE Report

  • Clear photos of MSP and loads / labels connected to the MSP.

  • Utility name / Utility bill.

  • PV System size (kWH) and estimated annual production (kWH).

  • Loads or appliances the customer is planning to add in the near future (pool, EV car or property expansion).


2. Load Calculations (including VEA Report or Load Sheet)

  • Clear photos of MSP and loads / labels connected to the MSP.

  • Loads or appliances the customer is planning to add in the near future (pool, EV car or property expansion).


3. Electrical Review / Stamps

  • Upload the latest plan set

  • If the AHJ requires a wet stamp, please provide the shipping address.

  • If the AHJ requires a split plan set, please write this in the description box.


4. 8760 Report

  • Clear photos of MSP and loads / labels connected to the MSP.

  • PV System size (kWH) and estimated annual production (kWH).


5. Bus Cert.

  • Clear photos of MSP and loads / labels connected to the MSP.

  • Clear photos of the Main Breaker.


6. Panel Schedule

  • Clear photos of MSP and loads / labels connected to the MSP.

  • If the case of multiple panels: if a separate panel schedule is needed, include photos of each panel.


7. Fault Studies


8. Post Installation Letter

  • Photos of the complete installation (include images showing the disconnect, PV breaker, installed solar panel model number & brand, grounding and other electrical connections).


For questions regarding our electrical services, please email support@creng.solar.


 

What would you like to see in next month's newsletter? Let us know.


Are you new here? Click the button below to automatically subscribe for monthly project tips via CRE's "Care to Succeed" email newsletter.



Recent Posts

See All

Comentarios


bottom of page